From Louisville Metro open data. Compiled October 8, 2026. The city has updated records here 1 time; each record shows once below, in its latest version.
A.) LWC
B.) E Kentucky St
C.) Between S Clay St & S Shelby St
D.) Lane & Sidewalk Closure. Road will be plated and open to traffic at the end of work shifts.
E.) Lead Replacement Project
One [1] pavement cut: 4' x 5'
F.) Restoration per LMPW utility policy. All utility markings will be removed from work area. Restoration plan attached.
G.) LWC Project 17326.04.
Resident notification letters sent on 08/11/2026.
Notification Plan Attached
Email notification sent to Metro Government.
H.) Project Manager: Joseph Sloan (502) 213-8427. jsloan@louisvillewater.com
Terry Likens (502) 762-3230
Contractor (Southern Pipeline Construction)."
To Date: 1789790400000
Republished 1 time since first seen.
On this block
Louisville Metro publishes these records to a hundred-block and not to an address. Each one is on the 700 block of E Kentucky St; the source does not state where.
We'll start you with everything within a couple blocks — you can narrow it to this exact address once you're signed in. Get alerts near here
Lamppost tracks building permits, restaurant inspections, property maintenance, food service permits, alcohol licenses, city services, planning & zoning, roadwork & closures, public meetings, crime, and metro council for Louisville. See what's current →
Every entry above links to its official source record where the source system provides one. If a record here is inaccurate or wrongly attributed, use the dispute link on that record — disputed records are removed from public view while reviewed. How Lamppost handles data