Excavation ,Lane ClosureLGE
WORK ON GARLAND AVE
BETWEEN S 15TH ST AND S 13TH ST
APPLICATION TO CLOSE EASTBOUND AND WESTBOUND CURB LANES, NOT CONCURRENTLY.
APPLICATION TO CLOSE SOUTHERNMOST SIDEWALK.
APPLICATION TO PERFORM (3) POLE REPLACEMENTS, (1) POLE REMOVAL, (1) 3'X40' ASPHALT CUT, AND (1) 3'X10' SIDEWALK CUT TO PERFORM UG ELECTRICAL WORK.
LINE TRANSFER AND POLE REMOVAL NOTIFICATION WILL BE HANDLED THROUGH NATIONAL JOINT UTILITIES NOTIFICATION SYSTEM (NJUNS).
CUTS TO BE RESTORED BY LMPW RESTORATION POLICY.
PROJ/TASK: ANBCD340O, ANBCD343U / 7204267I01, 7204279I01
PROJECT ENGINEER: CHRISTIAN CLAYCOMB: [email]: [phone]
DEREK WILKINS: [phone]
***CONTINUATION OF PERMIT #25-02439. WORK HAS NOT YET STARTED.***To Date: 1791432000000
Aug 12, 2026
Excavation ,Lane ClosureA) LWC
B) S 15TH ST
C) BETWEEN W.BRECKENRIDGE AND GARLAND AVE
D) STARTING ON THE EAST SIDE MOVING WEST ONE LANE AT A TIME UTILIZING FLAGGERS AND TRAFFIC CONTROL. THE ROAD WILL BE PLATED AND OPEN TO TRAFFIC AT THE END OF THE WORK SHIFT.
E) INSTALLING A FIRE SERVICE
ONE (1) 35X12 STREET CUT
ONE (1) 5X5 SIDEWALK CUT
F) RESTORATION PER LMPW UTILITY POLICY.ALL UTILITY MARKINGS WILL BE REMOVED FROM THE WORK AREA. THE RESTORATION PLAN IS ATTACHED.
G) LWC WORK ORDER: 26005744
H) PROJECT MANAGER CLAY ROBINSON CELL: [phone] EMAIL: [email]To Date: 1789099200000